Bayonne Bridge High Wind Tie Down Securement
Projects -Bayonne Bridge High Wind Tie Down Securement
Bayonne Bridge High Wind Tie Down Securement
County Fabricators manufactured a custom designed High Wind Tie Down Securement assembly for the gantry crane being used to install the segmented precast sections that will elevate the roadway of the Bayonne Bridge by 64 feet.
The assembly consists of four 40-foot anchor beams with nine lower beveled bearing plates, nine lower anchor plates, and deck brackets that will attach to the new precast bridge deck. The assembly will keep the massive gantry crane from swaying and becoming unstable in high wind conditions.