Goethals Bridge – W27 Soffit Beams

Goethals Bridge – W27 Soffit Beams

County Fabricators delivered Fourteen 80′ W 27 Beams headed to the New Goethals Bridge being built by Kiewit Weeks Massman JV.

Massive project transforming NY/NJ Waterways and Road Transportation!!!

Tappan Zee Electrical Conduit Supports

Tappan Zee Electrical Conduit Supports

The first two girder sub-assembly has been completed at the Coeymans yard and the assembly has been moved over the water on it’s way to the New NY Bridge. County Fabricators fabricated and assembled approx. 50,000 LF / 2,000,000 LB of ladder-style electrical conduit supports for the Approach Spans of the New NY Bridge. These units were fabricated, galvanized, assembled in our yard and shipped to the Tappan Zee Constructors assembly yard in Coeymans, NY. Once in Coeymans, the conduit supports were populated with conduits and installed onto the main bridge girders to be shipped down to the bridge site for final installation. This project was completed over a 27 month period from early 2015 to early 2017.

Tappan Zee Girder Alignment Mechanism

Tappan Zee Girder Alignment Mechanism

In anticipation of the erection of the approach span’s steel girders, Tappan Zee Constructors (TZC) required the fabrication of Girder Alignment Mechanisms. TZC awarded a contract to County Fabricators for the fabrication of three complete units. These units are to be used to assist in the erection and proper alignment of the 12′ tall x 350’+/- long sub-assembled bridge girders. This is a precise and precision assembly made to very strict tolerances.

Girder Nose Launch Assembly